Case Studies
January 7, 2011
Boston Brownstone Foundation Problem: This 3 story Brownstone structure located in the Chinatown District of Boston, Massa
July 10, 2011
Project Details: Berklee College of Music, located in Boston, Massachusetts, was renovating two exsting Brownstone building
October 17, 2009
Settling Foundation Problem: This 4-story building, located in the historic district of Portland, Maine, was
October 8, 2010
Case Study 1: Foundation Problem: A new addition was planned for an exist
December 20, 2007
Project: This eighty year old building in Worcester, Massachusetts was built over peat using conventional concrete caisson
November 20, 2010
Foundation Repair: This
November 13, 2007
Problem: This thirty year old split-entry house experienced sudden and dramatic foundation settlement. Several foundation
August 26, 2010
Project: The existing Hillsboro County Courthouse in Manchester, New Hampshire was originally built upon driven concrete-fi
October 26, 2011
Project Information:
|